Variable Valve Timing Mechanism
Crankshaft PulleyStarter Interlock Switch Inspection [Skyactiv G 2.0]
CAUTION:
Do not reuse the starter interlock switch if it is removed from the vehicle
even once. Replace with a new starter interlock switch when installing.
1. Disconnect the negative battery cable..
2. Disconnect the starter interlock switch connector.
3. Verify that the contin ...
Fuel Pump Relay
Purpose, Function
Controls the fuel pump on/off according to control signals from the PCM.
The fuel pump is operated only at engine start or when the engine is running
to improve safety.
Construction
The fuel pump relay is installed in the relay and fuse block.
...
Supplier Identification Procedure [Audio]
NOTE:
The unit supplier can vary. When asking the supplier (service center) for
repair or replacement, identify the supplier and fill in the Audio Repair Order
Form using the following procedures.
Verification procedure using label or inscribed lettering
1. Disconnect the negati ...