1. Measure the propeller shaft center runout using the dial gauge.

If it exceeds the maximum specification, replace the propeller shaft as a single component.
0.8 mm {0.031 in}
2. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

If it is not within the specification, replace the propeller shaft.
0.29—1.47 N·m {3.0—14.9 kgf·cm, 2.6—13.0 in·lbf}
Intermediate Shaft Removal/Installation
Propeller Shaft On Vehicle InspectionCharging System [Skyactiv G 2.0]
Outline
Regulator-less generator (built-in power transistor) has been adopted.
A generator using two delta connection type stator coils has been adopted.
Structural View
Structure
Consists of the following parts:
Battery
(See B ...
Main Relay [Skyactiv G 2.0]
Purpose/Function
Supplies power to each part.
Supplies battery voltage to each part based on the signals from the PCM even
though the ignition is switched on or off.
Construction
Installed to the relay and fuse block.
Operation
After the contact poin ...
Fuel Gauge Sender Unit Inspection [2 Wd]
NOTE:
For the fuel gauge sender unit removal/installation, refer to the fuel pump
removal/installation because the fuel gauge sender unit is integrated with the
fuel pump..
1. Verify that the resistance at fuel gauge sender unit terminals D and C is
as indicated in the table ac ...