Purpose, Function
Pulsation of intake air is controlled and intake air noise is reduced by adding an intake air passage.
Construction
The resonance chamber is installed to fresh-air duct.

Plug Hole Plate Removal/Installation
Valve MechanismEngine Oil Level Inspection
1. Position the vehicle on level ground.
2. Warm up the engine.
3. Stop the engine and allow at least 5 min before continuing.
4. Remove the dipstick, wipe it cleanly, and reinstall it fully.
5. Remove the dipstick and verify that the oil level is between the F and L marks
on the dipstick. ...
Front Frame (Rear) Installation [Panel Replacement]
Symbol Mark
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform
with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit p ...
Engine
Special Features
For SKYACTIV-G 2.0, the following is performed to lower fuel consumption.
Improvement of mechanical resistance loss
Narrowed down crankshaft journal
Optimized piston skirt shape
Lowered piston ring tension
...